Construction quotes ready in minutes, without calculation errors.
A complete Excel spreadsheet for contractors, engineers and owner-builders in South Africa. It works out materials, labour, mark-up and the project total β automatically.
Pay securely using Card (ZAR), Capitec Pay or EFT
Secure payment Β· instant access
Project total
R1 685 000
Materials
1 012 000
Labour
438 000
Plant
235 000
| Item | Qty | Rate | Total |
|---|---|---|---|
| Cement 50kg | 120 | 115 | 13 800 |
| Sand (mΒ³) | 45 | 450 | 20 250 |
| Cement blocks | 8 500 | 14 | 119 000 |
| Steel 10mm | 320 | 38 | 12 160 |
| Painter (day) | 28 | 450 | 12 600 |
Have you ever lost money on a badly priced quote?
Leaving out a material, getting the mark-up wrong or under-pricing labour can turn a profit of hundreds of thousands into a loss. Most builders in South Africa still do their sums on paper or on loose spreadsheets.
The solution
One spreadsheet. Your whole quote under control.
Automatic Calculation
Enter quantities and prices β the spreadsheet works out everything, including mark-up and VAT.
ABC Materials Curve
See which materials carry the most weight in your project cost.
Cash-Flow Programme
Plan monthly payments and the cash flow of the project.
Cost Build-Ups
Labour, plant, materials and statutory costs already set up.
Professional Quotation
Produce a quote that's ready to print and hand to the client.
Built for South Africa
Values in Rands, with categories and items from the local building market.
Complete package
What you get when you buy today
Delivered by email right after payment. No monthly fees, no fine print.
- βMaster Construction Quotation Spreadsheet (Excel)
- βUnit Cost Build-Up Module
- βAutomatic Cash-Flow Programme
- βABC curve and critical materials analysis
- βProfessional client quotation template
- βReference price base (Johannesburg, Cape Town, Durban)
- βStep-by-step PDF manual
- βVideo tutorial in English
- βWorks with Excel and Google Sheets
- βWhatsApp support
Construction Quotation Spreadsheet
60% OFF Β· for a limited time
- β‘ Instant download after payment
- π Secure payment (Card, Capitec Pay, EFT)
- π‘οΈ 30-day money-back guarantee
Pay securely using Card (ZAR), Capitec Pay or EFT
Secure payment Β· instant access
Checkout secured by Escalepay
The people who use it, recommend it
βI quoted a 3-bedroom house in 40 minutes. Before it took me 2 days.β
HΓ©lder Kiala, Pr.Eng
Contractor, Johannesburg
βMy client approved the first quote. The spreadsheet makes the work look professional.β
Arnaldo Cassoma
Builder, Kempton Park
βI love the ABC curve. I no longer waste money on the wrong materials.β
Telma JΓΊnior
Civil Engineer, Durban
Frequently asked questions
No. The formulas are already set up. You only enter the quantities and prices.
Ready to quote like a professional?
Get the spreadsheet in your inbox in seconds. Only R119 β once-off payment.
Pay securely using Card (ZAR), Capitec Pay or EFT
Secure payment Β· instant access